I. Equipment Name and Model:
MBF100-10 Medium-temperature Clean Chamber Furnace
II. Application Fields:
It is mainly used for the high-temperature heat treatment process of electronic devices, electronic ceramics and other similar products.
III. Technical Indicators and Basic Configuration
3.1 Rated Temperature: 900ºC;
3.2 Maximum Temperature: 1000ºC;
3.3 Inner Liner Material: Fused Quartz;
3.4 Effective Size: 450×450×500mm (Width×Height×Depth);
3.5 Heating Rate: ≤10ºC/min;
3.6 Heating Element: FEC Ceramic Fiber Heating Plate, heating from four sides;
3.7 Temperature Control Stability: ±1ºC, with the function of PID parameter self-tuning;
3.8 Temperature Uniformity: ±5ºC (tested in an empty furnace at a constant temperature of 900ºC);
3.9 Thermocouple Type: K Graduation;
3.10 Number of Temperature Control Points: 1 point;
3.11 Number of Temperature Control Segments: 9 segments;
3.12 Exhaust Chimney: There is an exhaust port at the tail, and the size of the exhaust port can be manually adjusted;
3.13 Air Intake Design: Dry, clean and oil-free compressed air or oxygen can be introduced into the furnace chamber. The air intake flow is controlled by a glass rotameter, with a measuring range of 10-100LPM;
3.14 Alarm and Protection: Sound and light alarm protection for over-temperature, thermocouple breakage, etc., and it has the function of power-off protection for over-temperature alarm;
3.15 Maximum Heating Power: 16kW;
3.16 Typical Heat Preservation Power of the Empty Furnace: ≤8kW;
3.17 Surface Temperature Rise: <35ºC;
3.18 Equipment Weight: Approximately 450Kg;
3.19 External Color of the Equipment: Light gray;
3.20 Reference Dimensions of the Appearance: 990×1680×1095mm (Width×Height×Depth).
IV. General Technical Description
Figure 1 Schematic Diagram of the Equipment
Delivery List |
|
Item |
Note |
QTY |
Basic Compositions |
Furnace |
|
1 unit |
Certificates of Inspection |
Furnace and major purchased components |
1 Set |
Technical Documents |
Furnace specifications, technical documents of major purchased components, etc |
1 Set |
Key Parts |
Touch screen |
|
1 PC |
Temperature Controller |
|
1 Set |
FEC Heater |
|
1 Set |
Quartz Liner |
|
1 Set |
Spares |
SSR |
|
1 PC |
Facility Requirements
4.1 Environmental conditions: Temperature 0 - 40ºC, humidity ≤ 80% RH, no corrosive gas, no strong
airflow disturbance.
4.2 Gas Source Conditions:
Clean, dry, oil-free compressed air or oxygen, working pressure 0.2 to 0.4 MPa, gas consumption approximately 3 to 6 m³/h;
4.3 Ventilation System:
Non-contact connection to the user's extraction system, with an extraction capacity greater than 10 m³/h.
4.4 Ground requirements: level, no obvious vibration, bearing capacity > 500Kg/m2 .
4.5 Power conditions: capacity greater than 22kVA, 3 phases 5 lines, voltage 220/380V, frequency
50Hz(according to local situation). Live wire: yellow, green, red, neutral wire: blue, ground wire: yellow-green;
4.6 Installation site: 2000mm×2000mm×3000mm (W×H×D), installation area greater than 4m2.